In 2009 I designed my First passive House. It was constructed in 2010 and certified in 2011. I learned A LOT from designing that house. Some of the details designed for that house I still use variations of today. In this video, I look at the Foundation / Floor Framing detail. It was a very Uniquedesign, and by many accords, it still is. Join me, as I walk thru the detail and describe my thoughts along the way………..Enjoy!!!
Sign up for the newsletter!
Steve's Instagram | Website